We knew when we started this whole addition/rehab project that, like every construction project, it would take a lot more time and more money than original estimates. Sigh. But we had a foundation over 2 months ago and yet there's no flooring in the addition yet. Apparently the painting is finished, but the contractor called yesterday to tell us there was some problem w/ the engineered flooring (pseudo-hardwood) we'd chosen for the new bedroom and we'd have to pick something else. Didn't we do that a few weeks ago w/ the linoleum? And the septic guy can't even come look at our system until next week at the earliest, so we don't have a single functioning bathroom, and there are fixture boxes all over the kitchen table, and there's a thick layer of construction everywhere, and the living room furniture is shoved over to one side in an only marginally comfortable arrangement... We'll be SO glad when the cabin is back to being a vacation place instead of a construction site!
Neighbors out there are having a block party this weekend. We were only going to go if we had a working septic system, but then decided we weren't gonna let a miserable plumbing problem spoil our fun. Seems a bit wasteful, gas prices being what they are, to drive 2 hours one way to go to a party, but we'll also stop by the cabin to check the progress, and maybe pick up some corn from a local produce market. (The corn we got last time was sweet as any candy; I love corn season!)
No comments:
Post a Comment