Oy, how long has it been since the last update on the Great Remodeling Project of 2010? The front bathroom is done! Full of stuff that will eventually get stored in the (larger) back bathroom, but it still looks much nicer than it did before.
The back bathroom is still in progress. The drywall is all up, including on the ceiling, the backerboard for the tile ditto. The Chief has finished painting walls & ceiling, barring a few touch-ups once the molding goes up around the doors and window. The medicine cabinet is up and lit, and the shower light has also been installed. Still to do: door and window molding, tile on the floor and in the shower; the tile should be in tomorrow or Friday.
And in the bedroom between the 2 baths, the bookshelves are finished. The Chief just finished working in the support pegs for the last of the shelves, so they're all ready for me to load 'em up. The rebuilt closet in there is mostly done; the doors still need handles and something needs to be worked out so the left-hand door doesn't hit the doorway molding when opened. The new closet has a big light in it and the hanging bar is high enough for just about anything to hang full length. And if need be, we can even shove those things to one side to make room for whatever an overnight guest might want to hang up. ;)
The worst of the dust-producing stages are behind us. We've already started dusting the books and things on the bookshelves, and today the Chief moved the double-wide bookshelf into the front bedroom, soon to be redesignated the library. Once I get the new shelves loaded up, the overflow (e.g., all my foreign language dictionaries and other reference books) can go into the library.
Look - light at the end of the tunnel, and it looks like it's not a train!